Number: 2800055
Country: Norway
Source: TED
1022201 SVV Gol co-use station and 24 hour resting place K201 Turnkey contract.
The Norwegian Public Roads Administration, South Region, has given the Norwegian Construction and Property Management Department the assignment of obtaining tenders for a turnkey contract for a new co-use station (combined traffic and control station) and a 24 hour resting place on national road 7 at Gol. The site is located by the new exit from national road 7 along Hallingdalselva.
Gol in Hallingdal.
The co-use station shall meet users" needs for station services and for the control of traffic along national road 7 and national road 52 to Vestlandet. The building consists of an administration building with public orientated activities and an inspection hall for large vehicles. The gross area is stipulated to be 667 m2 and the developed outdoor area.
The 24 hour resting place consists of a developed outdoor area with parking places for 21 lorries, a service building (toilet and shower facilities), 27 m2 gross.
The extent of the technical inspection equipment, user equipment is clarified in the requirement specifications and the accompanying annexes.
Option 9.1 Digital construction site, minimise needs for physical drawings.
Option 9.2 Automation of the construction site via a drilling-robot. Get practical experience with the use of a drilling robot. Making holes in the ceiling for fixing the technical systems.
Option 9.3 4D (scheduling in a model) and use of RFID-tags.
Option 4 Virtual reality (VR). Get practical experience with the use of VR glasses.
A site inspection of the property and an information meeting will be held for all tenderers 28.3.2016. See point 1.5 in the invitation for further information.