Number: 2792660
Country: Norway
Source: TED
Environment monitoring E18 Rugtvedt — Dørdal.
Nye Veier shall expand the E18 Rugtvedt-Dørdal to a four lane motorway in the period June 2017 to December 2019. The contract with the turnkey contractor is expected to be signed 10 May, with a quick start-up of the site work on the stretch, most likely in June. Nye Veier invites qualified tenderers to submit a tender for environment monitoring of streams and river systems outside the site area during the construction period, as well as an option for one to two years follow-up examinations.
Nye Veier shall expand the E18 Rugtvedt-Dørdal to a four lane motorway in the period June 2017 to December 2019. The contract with the turnkey contractor is expected to be signed 10 May, with a quick start-up of the site work on the stretch, most likely in June. Nye Veier invites qualified tenderers to submit a tender for environment monitoring of streams and river systems outside the site area during the construction period, as well as an option for 1 to 2 years follow-up examinations. The turnkey contractor will be ordered to monitor their emissions from the site area. The environment monitoring supplier shall document that they are independent from the turnkey contract as regards the environment monitoring.
The environment is monitored by NIBIO in the period June 2016 to June 2017 (pre-examinations and preparatory work with tree felling and some site roads). The report from this will be available in June.
Nye Veier has established a YM plan for the E18 Rugtvedt — Dørdal, which includes limits for water chemical parameters in the river systems. The plan will be made available for the contractor when the contract is signed. The plan has the status of New Veier"s steering document for the external environment work in the project and it has been approved by the County Governor in Telemark, as a replacement for a licence in accordance with the Pollution Act.
The tender shall cover environment monitoring for the site period July 2017 to December 2019 and follow-up examinations in 2020 and, if necessary, also in 2021.
Unit prices shall be given per measurement/sample taking station and analysis type/numbered element described below and a total price. Nye Veier shall be able to adjust the number of stations with an equivalent change in price.
Tenderers shall describe how HSE will be taken care of for personnel who shall work in the field and how security of supplies will be taken care of in the project.
Documentation with references for the execution of at least 3 equivalent projects shall be enclosed with the tender.
In addition, tenderers shall describe their experience in using automatic loggers in equivalent projects, as well as courses and certifications for the equipment. Any challenges shall also be described with an offered logger system. Documentation in the form of reports is wanted.
1 year follow-up examinations.