Number: 2623978
Country: Norway
Source: TED
1003601 Project New National Museum — K502 Central Processing/Automation.
This contract, K502 with associated drawings and documents, includes the following:
— Supply of distribution for managing, regulating and monitoring of operational installations.
— Supply of auxiliary control boards and other equipment in electro distributions.
— Supply of sensor and actuators in technical installations.
— Supply and assembly of exchange equipment for Central Processing System.
— Installation and programming of the overall central processing system.
— Testing and commissioning of technical installations.
The central processing system shall be executed in accordance with applicable public regulations and
Provision and in consultation with local authorities. All electro installations shall satisfy relevant
EU/EEA directives, applicable European standards or Norwegian standards, if the European standards
do not exist. All regulatory requirement in accordance with ‘Regulations on electrical low voltage installations’ (FEL)
With NEK 400:2014 shall be adhered to.
Technical regulations for The Planning and Building Act shall be fulfilled where requirements are set for the
Electro technical installations.
Particular emphasis will be placed on energy/climate/and operationally favourable system solutions.
Materials, equipment, components and execution are selected in accordance with this.
The electro technical installations are described in eight different contracts named K401 Elkraft [Electric Power], K4011.
Lighting (including outdoor), K501 Security, K5011 Network, K502 Central Processing Automation, K503 ICT Equipment, K5031 AV equipment and K601 Lifts. There are also individual electro-technical works
described in contract K201 Altering of Infrastructure, K204 Framework concrete works and K701
Outdoor works.