Contract Notice — New Main Pipeline Installations PK2-PK3
Lillehammer municipality shall lay a new main pipeline installations along the beach zone by Mjøsa between PK2 and PK3 in order to increase security. The pipeline installations consist of an approx. 1,3 km pipeline ditch. Parts of this must be founded on friction piles. The new pipeline installations are to be established in a parallel line to the existing pipeline installations.
Lillehammer.
The contract work mainly includes:
— water pipeline Ø600 mm, ductile cast iron, length approx. 830 m,
— water pipeline Ø200 mm, PVC, length approx. 110 m,
— water pipeline Ø150 mm, ductile cast iron, length approx. 280 m,
— joint sewage pipeline Ø800 mm, concrete, length approx. 530 m,
— joint sewage pipeline Ø600 mm, concrete, length approx. 240 m,
— joint sewage pipeline Ø400 mm, concrete, length approx. 210 m,
— joint sewage pipeline Ø400 mm, concrete, length approx. 60 m,
— surface water pipeline Ø600/500/300 mm, concrete, length approx. 170 m,
— 7 water manholes, cast on site,
— 5 prefabricated water manholes,
— 4 intake and outlet manholes for pump stations, cast onsite,
— 17 prefabricated sewage manholes,
— 2 prefabricated surface water manholes,
— ground work, including piling,
— various terrain work.
New main pipeline installations PK2-PK3